LCDOT Traffic Controls - Installed new fiber optic cabling, splicing, and terminations to provide a redundant route for LCDOT traffic signal communications and video systems.
ISHTA Tollway Controls Infrastructure- Installed fiber optic cabling in new conduit to facilitate a new intelligent traffic system for I-390. Fiber optic terminations within new plaza buildings, and at ITS device locations. Certification testing of all the newly installed fiber optic network.
Positive Train Control System- Installation and splicing of over 1.3 million feet of new fiber optic cable for the signaling and control of the new high speed rail. Included the installation of new fiber terminal equipment at signal cabins and certification testing.
Disney World Monorail - Installed new fiber plant to control upgraded train controls.
Kennedy Reversible Lanes- Installed new fiber optic cable along the highway and spliced into controllers and Dynamic Message Signs that operate the automated reversible lanes
(Photo from Chicago Tribune)
I-90 temp fiber relocation and new fiber installation - Completed over multiple years and multiple contracts, work included removing over 620,000 feet of fiber optic cable and installation of over 320,000 feet of temp fiber cables to allow for the
widening of the highway. Upon commencement of the road work, installed new fiber optic cables and removal of the temporary fiber network.
O’Hare Runway 9C-27C- Installed new fiber plant, terminated and tested for
new runway controls at O’Hare International Airport.